
<br />
<b>Deprecated</b>:  Using ${var} in strings is deprecated, use {$var} instead in <b>/var/www/e2024.protoaws.dzigual.com.br/wp-content/plugins/sitepress-multilingual-cms/classes/API/REST/class-wpml-ate-proxy.php</b> on line <b>128</b><br />
<br />
<b>Deprecated</b>:  Using ${var} in strings is deprecated, use {$var} instead in <b>/var/www/e2024.protoaws.dzigual.com.br/wp-content/plugins/sitepress-multilingual-cms/classes/API/REST/class-wpml-ate-proxy.php</b> on line <b>128</b><br />
{"id":103953,"date":"2023-10-30T09:40:58","date_gmt":"2023-10-30T12:40:58","guid":{"rendered":"https:\/\/www.engie.com.br\/?post_type=imprensa&amp;p=103953"},"modified":"2023-10-30T09:40:58","modified_gmt":"2023-10-30T12:40:58","slug":"engie-announces-acquisition-of-photovoltaic-complexes-with-a-total-installed-capacity-of-545-mw","status":"publish","type":"imprensa","link":"https:\/\/e2024.protoaws.dzigual.com.br\/en\/imprensa\/press-releases\/engie-announces-acquisition-of-photovoltaic-complexes-with-a-total-installed-capacity-of-545-mw\/","title":{"rendered":"ENGIE announces acquisition of photovoltaic complexes with a total installed capacity of 545 MW"},"content":{"rendered":"<p>On October 27, 2023, ENGIE Brasil Energia (EGIE3) signed an agreement to acquire the entire shares of Atlas Energia Renov\u00e1vel do Brasil S.A. and Atlas Brasil Energia Holding 2 S.A. The operation includes photovoltaic complexes in Juazeiro (BA), S\u00e3o Pedro (BA), Sol do Futuro (CE), Sert\u00e3o Solar BA) and Lar do Sol (MG), which together reach a total of 545 MW of installed capacity.<\/p>\n<p>The total acquisition value will be approximately R$ 3,240,000.00 (three billion, two hundred and forty million reais), divided between the purchase price for the amount of up to R$ 2,269,000,000.00 (two billion, two hundred and sixty-nine million reais), and the net debt of Atlas, in the amount of approximately R$ 971,000,000.00 (nine hundred and seventy-one million reais), which shall be consolidated.<\/p>\n<p>The values involved may be modified (earn-out), in accordance with the meeting of certain conditions enshrined in the Agreement, being subject to adjustments up to the date of closing the operation. It is also necessary to obtain the approval by the Brazilian anti-trust authority (Conselho Administrativo de Defesa Econ\u00f4mica \u2013 CADE), among other usual suspensive conditions for operations of this nature.<\/p>\n<p>The transaction reinforces a movement which began in 2015: with a strategy rigorously planned and executed, over the past six years the company has invested more than R$ 20 billion in the energy transition including investments in clean energy and the implementation of transmission lines.<\/p>\n<p>\u201cThis is one more step aligned to the execution of ENGIE Group\u2019s strategy of continuing to grow in renewable energy in Brazil. The way we conduct our acquisitions is based on a comprehensive analysis of risks, taking into account environmental and social aspects, together with aspects of governance as well as our own financial discipline, having as their objective the continuity and generation of positive results in a sustainable manner\u201d, Eduardo Sattamini, the Company\u2019s Chief Executive Officer commented.<\/p>\n<p>With the decision to invest in these assets, ENGIE Brasil Energia will ensure contracted energy compatible with the required return, positively impacting Ebitda margins in the long term. \u201cThe acquisition of operating assets, with contracted energy, has become an attractive option for efficiently expanding our businesses at this time in the market\u201d, explained Eduardo Takamori, Chief Financial and Investor Relations Officer at ENGIE Brasil Energia.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Juazeiro<\/strong><br \/>\nLocation: Bahia<br \/>\nStartup of operations: feb-19<br \/>\nInstalled Capacity (MWac): 120.0<br \/>\nCommercial Capacity (average MW): 34.8<br \/>\nContraction: ACR (Reserve Energy Auction) &#8211; Regulated Market<br \/>\nVolume sold (average MW): 34.8<br \/>\nPrice (~ R$\/MWh Base Dec\/2022): 433.00<br \/>\nTerm: 2018-2038<br \/>\nAuthorization until: 2051<\/p>\n<p><strong>S\u00e3o Pedro<\/strong><br \/>\nLocation: Bahia<br \/>\nStartup of operations: nov-18<br \/>\nInstalled Capacity (MWac): 54.0<br \/>\nCommercial Capacity (average MW): 15.0<br \/>\nContraction: ACR (Reserve Energy Auction) &#8211; Regulated Market<br \/>\nVolume sold (average MW): 15.0<br \/>\nPrice (~ R$\/MWh Base Dec\/2022): 451.00<br \/>\nTerm: 2017-2037<br \/>\nAuthorization until: 2051<\/p>\n<p><strong>Sol do Futuro<\/strong><br \/>\nLocation: Cear\u00e1<br \/>\nStartup of operations: may-19<br \/>\nInstalled Capacity (MWac): 81.0<br \/>\nCommercial Capacity (average MW): 16.2<br \/>\nContraction: ACR (Reserve Energy Auction) &#8211; Regulated Market<br \/>\nVolume sold (average MW): 16.2<br \/>\nPrice (~ R$\/MWh Base Dec\/2022): 429.00<br \/>\nTerm: 2018-2038<br \/>\nAuthorization until: 2051<\/p>\n<p><strong>Sert\u00e3o Solar<\/strong><br \/>\nLocation: Bahia<br \/>\nStartup of operations: dec-19<br \/>\nInstalled Capacity (MWac): 90.0<br \/>\nCommercial Capacity (average MW): 26.1<br \/>\nContraction: ACR (New Energy Auction)<br \/>\nVolume sold (average MW): 27.2<br \/>\nPrice (~ R$\/MWh Base Dec\/2022): 181.00<br \/>\nTerm: 2021-2041<br \/>\nAuthorization until: 2053<\/p>\n<p><strong>Lar do Sol<\/strong><br \/>\nLocation: Minas Gerais<br \/>\nStartup of operations: mar-23<br \/>\nInstalled Capacity (MWac): 200.0<br \/>\nCommercial Capacity (average MW): 53.0<br \/>\nContraction: ACL \u2013 Free Marke<br \/>\nVolume sold (average MW): 49.0<br \/>\nPrice (~ R$\/MWh Base Dec\/2022): N\/D <span class=\"info-number\">(1)<\/span><br \/>\nTerm: 2024-2042<br \/>\nAuthorization until: 2054<\/p>\n<p><strong>Totais<\/strong><br \/>\nInstalled Capacity (MWac): 545.0<br \/>\nCommercial Capacity (average MW): 145.1<br \/>\nVolume sold (average MW): 142.2<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Operation includes power plants in Juazeiro (BA), S\u00e3o Pedro (BA), Sol do Futuro (CE), Sert\u00e3o Solar (BA) and Lar do Sol (MG) and is aligned with the Company\u2019s strategy of investing in renewable energy sources.<\/p>\n","protected":false},"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-103953","imprensa","type-imprensa","status-publish","format-standard","hentry","tipo-release-renewables"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v23.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>ENGIE announces acquisition of photovoltaic complexes with a total installed capacity of 545 MW - Engie Website 2023<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/e2024.protoaws.dzigual.com.br\/imprensa\/press-releases\/engie-announces-acquisition-of-photovoltaic-complexes-with-a-total-installed-capacity-of-545-mw\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ENGIE announces acquisition of photovoltaic complexes with a total installed capacity of 545 MW - Engie Website 2023\" \/>\n<meta property=\"og:description\" content=\"Operation includes power plants in Juazeiro (BA), S\u00e3o Pedro (BA), Sol do Futuro (CE), Sert\u00e3o Solar (BA) and Lar do Sol (MG) and is aligned with the Company\u2019s strategy of investing in renewable energy sources.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/e2024.protoaws.dzigual.com.br\/imprensa\/press-releases\/engie-announces-acquisition-of-photovoltaic-complexes-with-a-total-installed-capacity-of-545-mw\/\" \/>\n<meta property=\"og:site_name\" content=\"Engie Website 2023\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/e2024.protoaws.dzigual.com.br\/imprensa\/press-releases\/engie-announces-acquisition-of-photovoltaic-complexes-with-a-total-installed-capacity-of-545-mw\/\",\"url\":\"https:\/\/e2024.protoaws.dzigual.com.br\/imprensa\/press-releases\/engie-announces-acquisition-of-photovoltaic-complexes-with-a-total-installed-capacity-of-545-mw\/\",\"name\":\"ENGIE announces acquisition of photovoltaic complexes with a total installed capacity of 545 MW - Engie Website 2023\",\"isPartOf\":{\"@id\":\"https:\/\/e2024.protoaws.dzigual.com.br\/#website\"},\"datePublished\":\"2023-10-30T12:40:58+00:00\",\"dateModified\":\"2023-10-30T12:40:58+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/e2024.protoaws.dzigual.com.br\/imprensa\/press-releases\/engie-announces-acquisition-of-photovoltaic-complexes-with-a-total-installed-capacity-of-545-mw\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/e2024.protoaws.dzigual.com.br\/imprensa\/press-releases\/engie-announces-acquisition-of-photovoltaic-complexes-with-a-total-installed-capacity-of-545-mw\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/e2024.protoaws.dzigual.com.br\/imprensa\/press-releases\/engie-announces-acquisition-of-photovoltaic-complexes-with-a-total-installed-capacity-of-545-mw\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/e2024.protoaws.dzigual.com.br\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Press Releases\",\"item\":\"https:\/\/e2024.protoaws.dzigual.com.br\/imprensa\/press-releases\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ENGIE announces acquisition of photovoltaic complexes with a total installed capacity of 545 MW\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/e2024.protoaws.dzigual.com.br\/#website\",\"url\":\"https:\/\/e2024.protoaws.dzigual.com.br\/\",\"name\":\"Engie Website 2023\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/e2024.protoaws.dzigual.com.br\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ENGIE announces acquisition of photovoltaic complexes with a total installed capacity of 545 MW - Engie Website 2023","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/e2024.protoaws.dzigual.com.br\/imprensa\/press-releases\/engie-announces-acquisition-of-photovoltaic-complexes-with-a-total-installed-capacity-of-545-mw\/","og_locale":"en_US","og_type":"article","og_title":"ENGIE announces acquisition of photovoltaic complexes with a total installed capacity of 545 MW - Engie Website 2023","og_description":"Operation includes power plants in Juazeiro (BA), S\u00e3o Pedro (BA), Sol do Futuro (CE), Sert\u00e3o Solar (BA) and Lar do Sol (MG) and is aligned with the Company\u2019s strategy of investing in renewable energy sources.","og_url":"https:\/\/e2024.protoaws.dzigual.com.br\/imprensa\/press-releases\/engie-announces-acquisition-of-photovoltaic-complexes-with-a-total-installed-capacity-of-545-mw\/","og_site_name":"Engie Website 2023","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/e2024.protoaws.dzigual.com.br\/imprensa\/press-releases\/engie-announces-acquisition-of-photovoltaic-complexes-with-a-total-installed-capacity-of-545-mw\/","url":"https:\/\/e2024.protoaws.dzigual.com.br\/imprensa\/press-releases\/engie-announces-acquisition-of-photovoltaic-complexes-with-a-total-installed-capacity-of-545-mw\/","name":"ENGIE announces acquisition of photovoltaic complexes with a total installed capacity of 545 MW - Engie Website 2023","isPartOf":{"@id":"https:\/\/e2024.protoaws.dzigual.com.br\/#website"},"datePublished":"2023-10-30T12:40:58+00:00","dateModified":"2023-10-30T12:40:58+00:00","breadcrumb":{"@id":"https:\/\/e2024.protoaws.dzigual.com.br\/imprensa\/press-releases\/engie-announces-acquisition-of-photovoltaic-complexes-with-a-total-installed-capacity-of-545-mw\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/e2024.protoaws.dzigual.com.br\/imprensa\/press-releases\/engie-announces-acquisition-of-photovoltaic-complexes-with-a-total-installed-capacity-of-545-mw\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/e2024.protoaws.dzigual.com.br\/imprensa\/press-releases\/engie-announces-acquisition-of-photovoltaic-complexes-with-a-total-installed-capacity-of-545-mw\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/e2024.protoaws.dzigual.com.br\/en\/"},{"@type":"ListItem","position":2,"name":"Press Releases","item":"https:\/\/e2024.protoaws.dzigual.com.br\/imprensa\/press-releases\/"},{"@type":"ListItem","position":3,"name":"ENGIE announces acquisition of photovoltaic complexes with a total installed capacity of 545 MW"}]},{"@type":"WebSite","@id":"https:\/\/e2024.protoaws.dzigual.com.br\/#website","url":"https:\/\/e2024.protoaws.dzigual.com.br\/","name":"Engie Website 2023","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/e2024.protoaws.dzigual.com.br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/e2024.protoaws.dzigual.com.br\/en\/wp-json\/wp\/v2\/imprensa\/103953"}],"collection":[{"href":"https:\/\/e2024.protoaws.dzigual.com.br\/en\/wp-json\/wp\/v2\/imprensa"}],"about":[{"href":"https:\/\/e2024.protoaws.dzigual.com.br\/en\/wp-json\/wp\/v2\/types\/imprensa"}],"version-history":[{"count":0,"href":"https:\/\/e2024.protoaws.dzigual.com.br\/en\/wp-json\/wp\/v2\/imprensa\/103953\/revisions"}],"wp:attachment":[{"href":"https:\/\/e2024.protoaws.dzigual.com.br\/en\/wp-json\/wp\/v2\/media?parent=103953"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}